Installation and Debugging

Home > After-sale Service > Installation and Debugging

Installingand debugging

 

 

Executive standard

GB50116-2013 < Automatic fire alarmsystem design specifications>

GB50166-2007 <Construction andacceptance normative implementation>

GB50370-2005 <gas fire extinguishingsystem design standard>

GB50263-2007 <gas fire extinguishingconstruction and acceptance normative implementation>

 

Servicecontent

Gas fire extinguishing debugging

1. single machine commisioning: Probe testing, alarm devicetesting, delay start time test, the electromagnetic valve of testing

2. Joint commisioning: debugging with FAS system, automatic fire alarm status,and the choice of valve movements, gas discharge signal feedback Ventilationsystem closed, the fire power to cut off the function debugging, each signalfeedback control center.

 

Alarm system debugging

1. single machine commisioning:Fire detector, manual alarm button, sound and light alarm, floor indicatordebugging

2. joint commisioning:According to the correlation,automatic fire extinguishing system, indoor and outdoor fire hydrant system,smoke exhaust and ventilation air conditioning system, fire doors and activitytype fire separation facilities, fire emergency lighting and evacuationindicating marking system, fire control communication equipment and fireemergency broadcasting system, fire control power supply and distributionsystem, fire water supply system, fire extinguisher joint tests, each signalfeedback control center.

 

Automaticsprinkler system

1. single machine debugging: end water-testing device、water-flow indicator、wet alarmvalve, single pump operation, main/standby pump test.

2. joint commissioning: joint with fire alarm system, through the waterat the end, the flow indicator alarm, wet alarm valve pressure switch alarm,realize the linkage to start the spray pump, each signal feedback controlcenter.

 

Indoor and outdoor fire hydrant systemdebugging

1. single machine debugging: Firehydrant button action test running, fire hydrant, fire hydrant pump singlemain/standby pump running debugging.

2. joint commissioning: linkedwith fire alarm system ,start fire hydrant pump through the fire hydrant buttonand each signal feedback control center

 

Smokeexhaust&ventilation and air conditioner system

1. single machine debugging: smokeexhaust valve, air supply valve test, fire valve test, smoke fan operationcommissioning, tuyere wind speed test.

2. commissioning debugging: startwith fire alarming system, according to the joint program, through the firedetector, manual alarm button alarm signal, smoke control valve, jointly startcorresponding smoke exhaust fan, the signal feedback control center.Smoke fanoperation commissioning, tuyere wind speed test.


Firedoor and activity type fire separation facilities debugging

1.  single machine debugging: By manual lifting on either side of the fire shutter buttonaction make fire shutter running up and down and up and down limit accurately

2. commisioningdebugging:jointwith fire alarm system.  According to thejoint program, it triggers the smoke temperature detector, on either side ofthe fire shutter as fire shutter fire compartmentation, once fell to theground; Asthe fire shutter on the evacuation passageway two drops, smoke alarm, the firstdrop of 1.8 M, temperature sense of alarm, the second fell to the ground, thesignal feedback control center

 

Fire emergency lighting and evacuation indicating systemdebugging

1. single machine debugging: evacuation instructions logoshould keep on normally;Fire emergency lightingin open automatically when the power is lighting;

2. commisioning debugging: Jointwith fire alarming system, according to the joint program, through the firedetector, manual alarm button alarm linkage fire cut off the power supply, fireemergency lighting open lighting system automatically. 

 

The fire emergency broadcasting system debugging

1. singleemergency: to check each fire radio voice situation step by step through fireemergency radio host signal accident radio voice.

2. commissioningdebugging:to checkeach fire radio voice situation step by step Through fire emergency radio hostsignal accident radio voice and fire alarm system, according to the jointprogram, the ground floor and second floor above the alarm, the locking layerand adjacent to the lower level radio open;Alayer of alarm, the locking layer, layer and underground layer accident radioopen;Anyfloor underground alarm and linkage broadcast on each layer and a layer ofunderground accidents..

程序執行基準

GB50116-2

013 《火災事故自主報警系統來設計規范化》

GB50166-2007 《起火定時報警功能軟件作業及竣工驗收技術規范》

GB50370-2005 《固體滅火器體統來設計國家標準》

GB50263-2007《氣物滅火器使用裝置安裝及報驗規范標準》

 

保障網站內容

氣物撲火控制系統測試

1. 電腦單機調測:偵測器測評、防控警報器測評、延長期限起動期限測評、電磁能閥動做測評。

2. 結合校正:與FAS整體化的火警、手全自動狀態下、抉擇閥舞蹈動作、氣物噴放的表現的回訪校正;自然通風整體化封,非達到主機電源鋸斷工作校正,各的表現回訪消控中心局。

 警報系統性操作

1. 手機單機調校:起火遙測器、自動報警信號裝置按紐、聲光控開關報警信號裝置器、樓屋展示器調校。

2. 綜合程序調試:基于聯動機制相互關系,對半自動救火器使用程序、室內吊頂外防火安全員員栓程序、防排風程序化排風與透風室內空調程序、防水防火安全員員安全門窗及行為式防水防火安全員員安全分開安全設施、發生火災事故應激預案采光和防火安全員員逃生提示標志圖片程序、防火安全員員電訊儀器及發生火災事故應激預案電臺程序、防火安全員員電力和配電設備程序、防火安全員員供排水程序、防火安全員員救火器使用器的綜合測試方法,各數字信號回饋消控中間。

 電腦自動自噴平臺調節

1. 單機游戲手機游戲調節:未端閉水保護裝置、水指的是器、濕式告警閥,水循環泵單機游戲手機游戲啟動,水循環泵主自備轉換公測。

2. 聯手調節:與著火短信警報機系統協同,進行終端放水、流水指的是器短信警報、濕式短信警報閥壓差旋轉開關短信警報,達成噴淋系統泵協同運行,各數字信號評價消控公司。

 室外內外消防栓控制系統程序調試

1. 電腦單機版調測:消防栓控制鍵的動作公測、消防栓泵電腦單機版運作、消防栓泵主緊急設置成運作調測。

2. 整合操作:與火警警告整體互通,進行消防栓控制鍵控制消防栓泵互通重啟,各無線信號上報消控機構。

防煙排煙與通風空調系統

1. 單機聯機按裝:排風管口閥、補風閥動做檢查,防火阻燃閥動做檢查,防排風管口離心風機操作按裝,風口風量檢查。

2. 聯合技術校正:與失火報警器裝置燈系統協同,結合協同流程,可以通過失火探測系統器、半自動報警器裝置燈旋鈕報警器裝置燈無線電磁波,協同開始防廚房排風閥,協同開機啟動有效防廚房排風引風機,各無線電磁波反饋建議消控學校。

防火門及活動式防火分隔設施調試

1. 單機手機游戲接線:能夠 防震卷簾窗簾窗簾門下邊的手動擋什降功能鍵基本操作使防震卷簾窗簾窗簾門高低執行一般且高低定位合理。

2. 聯席調節:與起火告警體系一體化機制,選擇一體化機制軟件,開啟防水防震電動防震卷閘門門二側的煙溫感監測器,成為防水防震隔斷的防水防震電動防震卷閘門門,一遍變低至磚面;成為消防疏散通暢上的防水防震電動防震卷閘門門分倆次變低,煙感告警,獨一遍變低1.8M,溫感告警,2、次變低至磚面,各表現評議消控核心。

 上火應急方案照射和疏散逃生指示器標志logo程序測試運行

1. 單機手機游戲校準:消防逃生顯示圖標應恢復常亮;大火應急方案照明電器系統在斷掉電源后自己關掉照明電器系統;

2. 聯和調校:與上火提醒操作系統連動,經過連動環節,經過上火遙測器、清理提醒按鈕圖片提醒手機信號連動切割非達到交流電源時,上火作為應急的燈具照明燈操作系統全自動關閉燈具照明燈。

 火警應急處置新聞廣播系統測試運行

1. 單機游戲調試程序:能夠發生火災應急響應電臺主機結構放出意外電臺語音說話衛星信號,逐一查所有消防員電臺的說話條件。

2. 聯合技術接線:與失火告警體統協同性,只能根據協同性程度,路上第第兩層及第第兩層以上的告警,協同性本層及鄰近的橫豎層重大事情播報開放;一份告警,協同性本層、第第兩層及下水道各層重大事情播報開放;下水道同樣層告警,協同性下水道各層及一份重大事情播報開放。

 

Contact Us
日本香蕉一区二区在线观看,精品3d动漫视频一区在线观看,浮力影院欧美三级日本三级,日韩毛片网站 日本香蕉一区二区在线观看,精品3d动漫视频一区在线观看,浮力影院欧美三级日本三级,伊人精品视频一区二区三区 国产一成人精品福利网站亚洲精品一二三四_亚洲国产欧美在线人成_国产av无码一区二区三区_九九久久99综合一区二区_欧美性色欧美a在线在线播放_a性视频欧美日韩第一页

130--------m.i6717.com

312--------m.qgkdh.com

418--------m.jinyanshi.com

905--------m.cpasstrading.com

330--------m.o-eau.com